1960 to 1980
Léopold Sédar Senghor
Hosted the first World Festival of Negro Arts in April 1966, with the Palais de Justice as an exhibition site, and first proposed the museum that became the Musée des Civilisations noires, SenePlus records.
Biennale / Event Supplements / Dakar Biennale 2026 / Host City
Dak’Art profile · Dakar city page · Free to read · Updated October 6, 2026
Dakar Biennale · Dakar · November 19 to December 19, 2026
The Dakar Biennale is an office of the Senegalese state. This page sets out who decides, what the published budgets say, what happened in 2024, and the country a visitor lands in this November.

The lists The Artists & Designers · Dak’Art: history and essays · Dak’Art on My Biennale · Dakar on My Biennale
Who runs it
The 16th Dakar Biennale (Dak’Art) is run from inside a ministry. The call for an artistic director issued at the start of 2026 came from the Secrétariat général (the biennale’s permanent office), placed under the Ministry of Culture, Crafts and Tourism, and that document gives the biennale no legal personality of its own. The state sets the calendar, pays most of the bill and owns the main building. That explains why the edition runs from November 19 to December 19, 2026 and not in May, and why a change of minister matters to whether the works ship on time.
The 2026 rules keep the structure of the 2012 regulations, which call the Secrétariat général “the operator”. The Secretary General, Marième Ba, is appointed by ministerial order and answers for the event’s finances. The Comité d’orientation (steering committee) is named by the culture minister and draws the outline of each edition. An international selection committee, on which the artistic director sits, chooses the works.
The committee’s president in 2026 is Abdoulaye Diop, whom APS identifies as a former finance minister. Its page lists 20 names by this guide’s count: artists, a gallerist, a musician, and officials of the culture, tourism and finance ministries and the City of Dakar (the list is on People). The members of the selection committee and of the prize jury had not been published as of October 6, 2026. Nor was the decree that created the biennale found; the Biennial Foundation directory dates its institution to 1989, without a decree number.
Khady Diène Gaye, Minister of Youth, Sports and Culture, signed the 2024 postponement. In September 2025 Amadou Bâ took over a new Ministry of Culture, Crafts and Tourism, a split from sport that answered complaints about the pairing, Le Quotidien reported. Alpha Thiam replaced him in the government published on June 2, 2026, with Mame Coumba Diop as junior minister for culture, creative industries and historic heritage.
At the handover, EnQuête+ listed “reinforcing the Dakar Biennale” among the urgent files. Bâ described what he was passing on: “Nous avons hérité d’un ministère avec l’un des budgets les plus faibles de l’État” (in English: the ministry he inherited had one of the weakest budgets of the State), APS reported.
“On ne sent pas la biennale au sein du ministère”
— Mame Coumba Diop, minister in charge of culture, creative industries and historic heritage, in APS via allAfrica, July 23, 2026. In English: the biennale is not felt inside the ministry.
By open call, in ten weeks. The call, dated February 1, asked for a curatorial concept, a statement of at most 4,500 characters, a CV and an exhibition history, from candidates fluent in French and English. The deadline was March 1 and the decision April 15. The Comité d’orientation assessed the files; the document states no fee and no budget for the post. On April 15 the Secrétariat announced Morad Montazami, and APS reported that the committee had made the choice. No number of applicants and no statement of the committee’s reasons was found. Montazami raised one objection himself: not being African could have been a weakness, he told Le Soleil. No named Senegalese artist or critic was found objecting in print. His profile is on People.
The artists’ call drew about 800 applications, 600 of them eligible and 117 Senegalese, Ba told APS in July. One loose end: APS then named two guest countries, Saudi Arabia and the Democratic Republic of Congo. The September reports name only the DRC, and no source explains the change (see The Exhibitions).
Whether the biennale should leave the ministry is its oldest quarrel. President Macky Sall raised it at the 2012 opening. The Secretary General of the day, Ousseynou Wade, said that June that the question covered legal status, financing and sustainability, and came from observers and partners, not from his office. One partner had already acted: the European Commission withdrew its support in 2010, by the Biennial Foundation’s account.
In 2014 both positions appeared in one article. Marie Thérèse Turpin Diatta, then president of the Comité d’orientation, is quoted: “Je suis convaincue que la Biennale de Dakar ne pourra assurer sa pérennité que si elle devient autonome.” (in English: the biennale can only secure its future by becoming autonomous). The unnamed artist quoting her, in La Veille culturelle via SenePlus, argues that autonomy would serve private interests, that curators and committees are already independent, and that the state supplies offices and staff on top of its grant. The verdict: “Si l’Etat se détache, c’est la mort de la Biennale.” (in English: if the State lets go, the Biennale dies). A SenePlus commentary, undated, faults both sides: the state underfeeds the biennale yet guards control, while the Western funders who pay most impose their orientations.
The state’s line in 2026 is that the model works. At the September 24 launch Diop said: “L’Etat a bien compris son rôle dans le développement des arts et de la culture et continue de l’assurer pleinement” (in English: the State has understood its role in developing the arts and culture and continues to fulfil it fully), according to APS. Two months earlier the junior minister, visiting the biennale’s headquarters, had said the sentence printed above.
The biennale’s timeline, 1960 to 2026
“si les oeuvres n’arrivent pas à Dakar, nous ne pouvons pas faire une biennale”
— Marième Ba, Secretary General of the biennale, in APS via allAfrica, July 23, 2026. In English: if the works do not reach Dakar, there can be no biennale.What it costs
No budget for the 2026 edition had been published as of October 6, 2026: not in APS, not on the organizer’s site, not in the ministry’s budget reports. What exists is a run of figures from ministers, press kits and critics, each measuring something slightly different.
| Edition | Figure | Who gave it |
|---|---|---|
| 2008 | State share about 36% of the total | The culture minister, in 2022 |
| 2018 | State share 75% “since 2018”; total not published | Organizer’s 2022 press kit |
| 2022 | State allocation 750 million CFA francs a year | Minister and press kit, as above |
| 2022 | “One billion” CFA francs for the edition | An artists’ collective critical of the organizers |
| 2024, April | Planned 1.5 billion CFA francs (about 2 million euros), a third reportedly paid Unconfirmed | Unnamed committee source, SenePlus |
| 2024, November | State 1.8 billion CFA francs; private sector about 291 million “to date” | Minister Khady Diène Gaye, RTS |
| 2026 | Not published |
On the minister’s 2024 numbers the private share is about 14% (291 of 2,091 million); that is this guide’s arithmetic, not a published ratio. The whole ministry has 28.9 billion CFA francs for 2026, down 1.8% on 2025, Le Soleil reported. A government note speaks of a rise; the two may measure different perimeters. Neither gives a line for the biennale.
The organizer’s partners page, last modified May 22, 2026, shows more than 40 logos, most unnamed. Those identifiable are the Presidency, the Primature, the Ministry of Culture, the City of Dakar, UNESCO, ECOWAS, Ecobank, SUNU and the cement company SOCOCIM. The page does not say whether it reflects 2026 or 2024. The European Union, the Francophonie, the Institut français, the Goethe-Institut, Sonatel and Eiffage are not named as 2024 or 2026 partners in any text read for this guide.
The state says yes. At the launch Thiam said: “L’Etat de Sénégal [...] continuera sans équivoque d’assurer son soutien et son accompagnement” (in English: the State of Senegal will unequivocally continue its support and backing), as APS reported. Diop asked for public support to be strengthened and diversified in future editions, in a second APS piece. In deeds: the tender for international transport of works had been launched by July, and on October 6 allAfrica reported shipping under way and the courthouse works proceeding. No report of unpaid artists or suppliers from 2024 was found. No figure or payment schedule has been published either.
“More than 780,000 visitors” in 2024 dates from the September 2026 launch. Sud Quotidien attributes it to the minister; APS carries it without a method. The organizer’s figures page still gives only 2018: nearly 250,000 visitors, more than 50,000 from abroad. The minister’s published statement notes strong digital circulation, which leaves open whether 780,000 counts physical visits. No source explains a tripling in six years. Read it as the minister’s figure. It is not an audited count.
No study of the biennale’s economic effect was found. The nearest hard number is national: more than 50,000 hotel rooms at about 40% average occupancy, the tourism employers’ federation said in April 2026, according to Seneweb.

2024
Every promise about 2026 is heard against 2024. The 15th edition was due to open on May 16. On April 24, three weeks out, the ministry moved it to November 7 to December 7.
Its communiqué read: “Ce report, par-delà les contraintes et les aléas induits par le contexte national et international, tient à la volonté des nouvelles autorités en charge du secteur d’organiser la biennale dans des conditions optimales” (in English: beyond the constraints of the national and international context, the postponement stems from the new authorities’ wish to hold the biennale in optimal conditions), as quoted by Le360 Afrique with AFP. Those authorities were a month old: the presidential election was on March 24.
The same report said the press had already written that money for shipping works and housing artists had not been released. In town the absence showed. The Ivorian artist Pascal Nampémanla Traoré told Le Quotidien: “Il n’y a pas une seule affiche, il n y a pas un spot publicitaire, un spot radio” (in English: not one poster, not one advertisement, not one radio spot). Later accounts varied. The biennale said in August that the delay let the new president and minister study the file; in November the minister cited logistics and the need to mobilize resources.
The selection was kept. Participants were penalized by the time and expense involved, On Art Media wrote; no costed figure was published. Many OFF exhibitions (the OFF is the independent programme alongside the official one) opened in May anyway, under the tag #TheOffIsOn. President Bassirou Diomaye Faye opened the edition at the Grand Théâtre national on November 7.
Three days before the announcement, the Collectif des artistes indépendants du Sénégal had asked for that outcome. Its coordinator, Amadou Diop, told Dakaractu: “La prudence exige le report et l’audit de la Biennale par les nouvelles autorités” (in English: prudence requires that the new authorities postpone and audit the Biennale). The collective’s allegations are one party’s and untested. It said the 2022 edition’s one billion CFA francs had never been properly evaluated, that too much went to concerts, and that “nearly 200 million” was earmarked for a “Pavillon Sénégal” linked to the artist Alioune Diagne; the article does not make clear whether that means Venice or Dakar. Unconfirmed
No reply from the organizers was found, and no audit by the Cour des comptes or the Inspection générale d’État. A New York Times report of June 2024 was headlined “Delays and Allegations Cool Off Africa’s Hottest Art Event”; the syndicated text read contains no detailed allegation. The state’s answer is the 2026 calendar, set from the outset for the end of the year.
The venues as policy
All three venues in the organizer’s menu are state property. What to see in each is on What to See; this section covers who owns them and what is planned.
The former courthouse is the main venue, APS reports, and regreening it is one of the five curatorial lines. It closed as a court in 1992 after cracks raised fears of collapse, and the biennale first used it in 2016, by Jeune Afrique’s account. That year the Comité d’orientation’s president, Baïdy Agne, asked President Sall to make it a contemporary art museum. Artists replied that coastal erosion was cracking the structure and asked for an engineering assessment first, EnQuête+ reported. In early 2017 Sall allocated the building to the Ministry of Culture.
On the present works the record is thin. Ba welcomed their progress in July 2026, and they were reported as proceeding on October 6. No contractor, cost or completion date has been published. No structural problem was reported in 2026 either.
Two architecture firms publish a private scheme for the site. Wilmotte & Associés lists a “Palais des Arts” in Dakar: a former courthouse on the Plateau renovated into a palace of the arts (9,000 m²), a hotel (8,100 m²) and housing (56,700 m²), for a client named Ascent Promotion, with completion given as 2027. The Moroccan firm AWM publishes its 2023 competition entry under the same name, explicitly as the conversion of the Ancien Palais de Justice at Cap Manuel: 69,942 m² built, with three hotels, housing, shops and restaurants around the restored palace.
The two pages support that much and no more. The two pages, read on October 6, 2026, are the only sources. No Senegalese government statement was found on the scheme, on its status under the present government, or on its relation to the works under way for the biennale. Whether it is live or shelved is not known. Unconfirmed
Travel links go to booking partners; Biennale may earn a commission. Prices and availability are set by each partner.
Senegal in 2026
The president is Bassirou Diomaye Faye, elected on March 24, 2024. Whether he will open the 2026 edition in person had not been announced as of October 6.
One name has changed. The Prime Minister is Ahmadou Al Aminou Lô, an economist and former BCEAO official, not Ousmane Sonko. Faye dismissed Sonko in late May 2026, and sources differ on the day: a France 24 report is dated May 23, Burkina24 points to May 22, and Africa Radio says May 25. Lô’s appointment is dated May 25 by Burkina24 and May 26 in the decree cited by Vie-publique.sn. The reported background was the debt crisis and stalled talks with the IMF.
In February 2025 the Cour des comptes put debt at the end of 2023 at 99.7% of GDP, against 74.41% previously reported: about 7 billion dollars of hidden borrowing, by the Reuters timeline on CNBC Africa. An IMF facility of 1.8 billion dollars had been suspended in October 2024, and S&P cut the rating to CCC+ in November 2025. By 2026 debt was beyond 130% of GDP, with interest taking about a quarter of state revenue, according to Credendo.
On September 1, 2026, the IMF announced a staff-level agreement on a 36-month facility of SDR 1,537.1 million, about 2.2 billion dollars. It still needs Executive Board approval, corrective actions on past misreporting and a debt treatment. Senegal said the same day that it would seek a restructuring of its external debt under the G20 Common Framework. The revised 2026 budget of September 19 sets a deficit of 1,735.2 billion CFA francs, or 7.6% of GDP against 5.4% planned, and cuts domestically financed capital spending by 315.7 billion. Its ministry-by-ministry breakdown could not be read, so the effect on culture is not known.
That is the frame for the money question: a state seeking debt restructuring is paying for a Youth Olympics and a month-long biennale in the same quarter.
The calendar
The Youth Olympic Games Dakar 2026 run from October 31 to November 13. The biennale opens six days later. The organizer’s January release presents the sequence as momentum.
The Games are large: about 2,700 athletes, up to one million spectators and 25,000 accreditations, Agence Ecofin reported, across Dakar, Diamniadio and Saly. For them, 74 hotels with about 5,200 rooms were put under contract, per Seneweb. Ecofin also lists a TER train every 8 minutes, 370 extra buses and a “JOJ Taxis” scheme; the sources do not say which of these continue after November 13.
For a biennale visitor, two things follow. Anyone arriving before November 13 lands in the Games, and Au-Senegal advises extra travel time on congested roads. And the effect on hotel prices in the opening week is unknown: no measured figure was found. Book early (see where to stay).
No fixed public holiday falls inside the biennale’s dates, by the Wikipedia list. Unconfirmed The 2026 dates of Partcours, the gallery circuit that usually runs alongside, were not posted: its site still showed November 2024. The day-by-day view is on The Guide.


The city
Dakar sits on the Cap-Vert peninsula, and its region is the densest in Senegal: 7,485 inhabitants per square kilometer against 92 nationally, in the final report of the 2023 census. The country counted 18,126,390 people with a median age of 19. The region’s population is given as 3,896,564 in a Wikipedia table citing the statistics agency. Unconfirmed
Land is the scarce thing, and the coast is where that shows. A month into office, in late April 2024, the new government suspended construction on Dakar’s corniches and the maritime public domain pending an inventory; campaigners had long denounced the privatization of the coast by hotels and housing, AFP reported. The courthouse at Cap Manuel, with its two published futures, stands on that edge. Where studios and independent spaces are is on the district map.
Power has moved the other way. Ministries have been relocated to Diamniadio, a new city about 30 km out by Wikipedia’s figure Unconfirmed, and the June 2026 culture handover was held there. The minister responsible for the biennale works far from the Secrétariat and from every venue.
Two transport projects matter to visitors. The TER train reached Blaise Diagne airport on September 28, 2026: 55 km in all and about 55 minutes from Dakar, Dakaractu reported. The Bus Rapid Transit line runs 18.3 km from Petersen, in the center, to Guédiawaye, by the French Wikipedia entry; on that route it stops short of Cap Manuel. Unconfirmed Fares and taxis are on getting around. The rainy season, June to September, floods roads, the UK government notes; the biennale falls in the dry months.
December 2026Miami Art WeekArt Basel Miami Beach, 17 fairs, the museums, the nights. The full guide.Culture as state policy
Each of Senegal’s five presidents left a building, a festival or a decision that a visitor in 2026 walks through. The longer account is on Dakar Art Scene.
1960 to 1980
Hosted the first World Festival of Negro Arts in April 1966, with the Palais de Justice as an exhibition site, and first proposed the museum that became the Musée des Civilisations noires, SenePlus records.
1981 to 2000
The biennale was instituted under him in 1989, with literature in 1990 and visual art in 1992, per the Biennial Foundation directory.
2000 to 2012
Confirmed state support in 2000, fixing the two-year rhythm, by the same directory. He laid the museum’s foundation stone in 2003 and inaugurated the Grand Théâtre in 2011. The state paid about 36% of the biennale’s budget in 2008.
2012 to 2024
Raised the autonomy question, gave the courthouse to the culture ministry in 2017, lifted the state’s share to 75% and opened the museum in 2018. The “Palais des Arts” competition dates from 2023, by AWM’s page.
Since 2024
His government postponed the 2024 edition, then funded it with 1.8 billion CFA francs. He opened it in person; his speech cast culture as a source of jobs. Since then: three ministers, and an edition placed behind the Youth Olympics.
Presidents build and ministers change. Current policy, the artist’s statute and restitution are on Dakar Art Scene.
As an Amazon Associate, Biennale earns from qualifying purchases. Links open Amazon search results; prices and editions are shown by Amazon.
The continent
The 2014 opinion piece against autonomy compared Dakar with state-run festivals elsewhere in West Africa. The table makes the comparison with dates.
| Event | Who runs it | Latest edition and 2026 status |
|---|---|---|
| Dakar Biennale, Senegal | The state, through the culture ministry | 16th edition, November 19 to December 19, 2026 |
| Cairo Biennale, Egypt (1984) | Fine Arts Sector of the Ministry of Culture | Last listed: 13th, 2019. No 2026 information found |
| Rencontres de Bamako, Mali (1994) | Government of Mali with the Institut français | 14th edition, November 2024 to January 2025. No 2026 information found Unconfirmed |
| FESPACO, Burkina Faso (1969, film) | A state institution since a 1972 decree | Biennial; 2025 and 2027 dates not found Unconfirmed |
| Biennale de Lubumbashi, DRC (2008) | The independent Picha art center | 9th edition announced for October 2026 |
| Lagos Biennial, Nigeria | The non-profit Àkéte Art Foundation, endorsed by Lagos State | 5th edition, pre-opening November 13, 2026 |
| Kampala Art Biennale, Uganda (2014) | The private Kampala Arts Trust | Last listed: 2020. No 2026 status found |
| Marrakech Biennale, Morocco (2005) | Private founders, under royal patronage | Last edition 2016. Nothing documented since Unconfirmed |
Each side of Dakar’s argument can find support here. The state-run events are the oldest, yet Cairo, the closest model to Dakar’s, shows no edition after 2019. The two privately founded ones, Marrakech and Kampala, have none on record since 2016 and 2020. Besides Dakar, the two with an edition dated 2026 are Lubumbashi and Lagos, both run by independent bodies. That reading is this guide’s, and three rows rest on Wikipedia alone. The DRC, home of Lubumbashi, is Dak’Art’s guest of honor this year. For the year’s other biennales see 2026 in Review and Dak’Art on My Biennale.
Safety and rights
Four governments’ pages were read on October 6, 2026. They differ in tone for the same city. Read your own government’s before you travel; daily precautions are on the practical page.
| Government | Level | Date on the page |
|---|---|---|
| United States | Level 1, exercise normal precautions; Casamance Level 2 | December 1, 2025 |
| United Kingdom | No advice against travel to any part of the country | Updated May 13, 2026 |
| Canada | Exercise a high degree of caution, because of crime | September 28, 2026 |
| France | Dakar in yellow, reinforced vigilance; some border areas orange | September 29, 2026 |
On substance they converge. The UK says robbery, burglary and bag-snatching have increased in Dakar, that protests can turn violent and block roads, and that terrorist attacks cannot be ruled out. Canada names the Corniche in the evening and the Gorée ferry terminal.
The law changed this year. The UK’s safety page states that on March 30, 2026, Senegal amended its legislation, raising prison sentences for same-sex relations to between five and ten years and criminalizing the promotion, support or funding of homosexuality; it states that the law is enforced and has led to arrests. France’s notice of April 16, 2026 gives the same sentences with a mandatory minimum of five years, says an approach or an attempt can lead to prosecution, and describes two new offenses, advocacy and the financing or support of promotion, each carrying a possible three to seven years. Canada dates the enactment March 31 and says scrutiny may extend to a person’s online presence. The US country page, dated December 4, 2025, predates the change.
The text is Law No. 2026-08, amending Article 319 of the Penal Code, adopted on March 11, 2026, as Dakaractu reported. Front Line Defenders counted at least 70 arrests between February and April 2026 and says the promotion offense, which covers speech, writing, image and sound, reaches journalists and organizations. No source read discusses its application to exhibitions, and none reports an effect on the 2026 selection.
Senegal ranked 78th of 180 in the 2026 index of Reporters Without Borders, down from 74th and now in the band labeled a problematic situation, APS reported. RSF cites fragile media economics and a resurgence of arrests of and violence against journalists, PressAfrik added. The outlets to follow are on Live.
Checked October 6, 2026. Budgets, ministers and advisories change; confirm with the organizer and your own government. Biennale is independent and not affiliated with the Dakar Biennale or the Senegalese government.
Sources. Main sources: the organizer’s 2026 call, 2026 rules and 2022 press kit; APS dispatches of July 23 and September 25, 2026; RTS; Dakaractu; SenePlus; Jeune Afrique; Wilmotte & Associés and AWM; AidData; the IMF; Reuters via CNBC Africa; and the four governments’ travel pages. Items marked Unconfirmed rest on one non-official source or on Wikipedia. Not found: a 2026 budget, the founding decree, any official audit, the renovation’s cost, and any government statement on the “Palais des Arts”. Corrections: contact@biennale.nyc.
Related
Did you know
Every page on Biennale is free to read, with no account.
Start a trip from any city page and the dates fill in for you.
Wallet keeps tickets, passes and bookings in one list.
Saved biennales and fairs appear on your own calendar.
Biennale is an independent publication. It is not affiliated with, sponsored by, or endorsed by the Biennale de l’Art africain contemporain de Dakar, its Secrétariat général, the Republic of Senegal, or any museum, gallery, institution or brand named on this page. All trademarks belong to their owners.
Images and photographs. Biennale asserts no ownership interest in any image or photograph on this site, except where the credit reads Biennale Editorial Staff. Where the source is known, publicity and press images are credited to it. Biennale claims no copyright or other right in third-party property; all such rights are deemed reserved by their respective owners.